To measure current, you must first prepare the Development Kit (DK).
The suggested configurations split the power domains for the application nRF52833 System on Chip (SoC) and the rest of the DK.
- To put P22 in series with the load, cut the PCB track shorting solder bridge SB40.
- To restore normal kit function after measurement, solder SB40 or apply a jumper on P22.
Figure 1. Preparing the DK for current measurements