To measure current, you must first prepare the Development Kit (DK).
The suggested configurations split the power domains for the nRF52840
System on Chip (SoC) and the
rest of the DK.
- To put P22 in series with the load, cut solder bridge SB40.
- To restore normal kit function after measurement, solder SB40 or apply a jumper on P22.
- To reprogram the nRF52840 SoC while the DK is prepared for current measurements, remove measurement devices from P22, and then connect the Universal Serial Bus (USB) cable.
Figure 1. Set up the DK for current
measurements